ROOF REPLACEMENT - MATERIALS LIST Cross-gable, ~14 squares, 2 valleys. Compiled 2026-09-05. Fill in QTY as you count. "Doc" = the install PDF in this folder that governs the item. ===================================================================== SHINGLE SYSTEM (Owens Corning) ===================================================================== [ ] Shingles - OC TruDefinition Duration, Williamsburg Gray Menards SKU 1513159 | 32.8 sq ft per bundle (~3 bundles/square) QTY: ____ bundles Doc: OC_TruDefinition_Duration_Shingles_Install_10014283-L_Jul2026.pdf Nails: 4 per shingle standard (6 in high wind), in the SureNail strip. [ ] Starter strip - OC Starter Strip Plus Menards SKU 1511910 | 105 lin ft per bundle (splits into two 7-3/4" strips) QTY: ____ bundles Doc: OC_Starter_Strip_Plus_Install_10027064-A_Jul2024.pdf Use on eaves AND rakes. Overhang eave 1/4" to 3/4". 5 nails per strip. [ ] Hip & ridge cap - OC ProEdge, Williamsburg Gray Menards SKU 1512325 | 33 lin ft per bundle QTY: ____ bundles Doc: OC_ProEdge_HipRidge_Install_10017200-E_Apr2025.pdf 6" exposure. Last piece: exposed nails covered with roof cement. [ ] Ridge vent - OC VentSure 4' Shingle-Over Ridge Vent with Filter Menards SKU 1474951 | 4 ft per piece QTY: ____ pieces Doc: OC_VentSure_4ft_RidgeVent_WeatherPROtector_Install_10011388-C_Apr2020.pdf Cut 1" slot each side of ridge, stop 6" from ends, 12" from chimney. Cap shingles over vent need LONGER nails (see "still needed" below). ===================================================================== UNDERLAYMENT / WATERPROOFING ===================================================================== [ ] Ice & water barrier - OC WeatherLock G, 3' x 66.7' (200 sq ft) Menards SKU 1511827 QTY: ____ rolls Doc: OC_WeatherLock_Series_IceWater_Install_10011693-A_Oct2019.pdf Goes on bare deck: valleys first (full 36" width centered), then eaves (from edge to at least 24" inside the exterior wall line). OVER the eave drip edge, UNDER the rake drip edge. Cover within 30 days. [ ] Synthetic underlayment - DuPont Tyvek Protec 120, 4' x 250' (10 sq) Amazon QTY: ____ rolls Doc: DuPont_Tyvek_Protec_Install_Guidelines_43-D100784.pdf Meets ASTM D8257 (satisfies OC's requirement). 4" side lap, 6" end lap. Cap nails 12" o.c. on laps, one row 24" o.c. down the middle. OVER eave drip edge, UNDER rake drip edge. Cover within 3 months. ===================================================================== METAL EDGES & FLASHING ===================================================================== [ ] Drip edge (rakes) - Style-D White Aluminum, 2-5/8" x 1-11/16" x 12' Menards SKU 1571398 | model ADE12-WH (Gibraltar family) QTY: ____ pieces (12 ft each) Doc: Gibraltar_DripEdge_GutterApron_Install_Guidelines.pdf Overlap joints 2-3". Hung, not pinned tight (aluminum moves). [ ] Gutter apron (eaves) - White Aluminum, 2-1/2" x 2" x 10' Menards SKU 1576840 | model GA-WH (Gibraltar) QTY: ____ pieces (10 ft each) Doc: Gibraltar_DripEdge_GutterApron_Install_Guidelines.pdf Installed first, before any underlayment. Lip hangs into the gutter. [ ] Valley metal - 24" x 10' Charcoal Black Steel "W" Formed Valley Menards SKU 1571357 QTY: ____ pieces (10 ft each) - for 2 valleys Docs: OC_TechBulletin_Open_Valleys_TB-10024108_Apr2020.pdf Gibraltar_W-Valley_V18G_Install_Guidelines.pdf OC requires min 26 gauge -> CHECK GAUGE ON LABEL. Width 24" is OK. Lap pieces 12" with roof cement between. Nail 1" from edges only. [ ] Step flashing - 8" x 8" Black Painted Steel Preformed, 100 pieces Menards SKU 1573781 | model 4X4X8GALVBL-100 (Gibraltar) QTY: ____ boxes Doc: no maker sheet exists. Use Duration PDF section 7 "Step Flashing" + ARMA 2014 manual chapter 10 + IRC R905.2.8.3. One piece per shingle course where roof meets a wall. [ ] Pipe boot - IPS 3"-4" Flexible Roof Vent Pipe Flashing Menards SKU 1574234 | model 81658 QTY: ____ (one per plumbing vent pipe) Doc: IPS_Roof_Flashing_Install_Instructions_all-flexible.pdf No petroleum-based sealant on the rubber collar. Nail only where shingles will cover. [ ] Exhaust roof cap - Broan Black Roof Exhaust Ventilation Cap Menards SKU 6112316 | model 636 (3" or 4" round duct) QTY: ____ (one per bath/kitchen exhaust duct) Doc: Broan_636_RoofCap_Install.pdf Not for flat roofs. Birdscreen in before installing. Tape duct joints. ===================================================================== FASTENERS ===================================================================== [ ] Shingle nails - Bostitch 1-1/4" x .120 15-degree coil roofing nails, EG smooth shank full round head, 7,200 count Menards SKU 2082725 QTY: ____ boxes OC rule: min 12 gauge shank, 3/8" head, must go 3/4" into deck or at least 1/4" through the sheathing. .120 shank = ~11 gauge, OK. 1-1/4" is fine for single-layer shingles on plywood/OSB. Rough need: 14 sq x ~320 nails/sq = ~4,500 nails (4-nail pattern). [ ] Cap nails (underlayment) - Grip Fast 1" EG Ring Shank Plastic Cap Nail, 2,000 count Menards SKU 2294555 QTY: ____ boxes Tyvek requires 1" min cap diameter - these qualify. ===================================================================== SEALANTS ===================================================================== [ ] Roof cement - SealBest Rubberized SBS Premium Roof Cement, 10 oz tube Menards SKU 1538816 | model H9031 | ~30 lin ft of 1/4" bead per tube QTY: ____ tubes (2 valleys x 12" laps + ridge-cap end + cut valley edges: plan on several tubes, or the 29 oz size, SKU 1536009) Doc: SealBest_SBS_Premium_Roof_Cement_TechData.pdf Uses: valley metal laps, exposed nails on last ridge cap, bed under cut shingle edges along the valley. !! OC asks for ASTM D4586 cement. SealBest's data sheet does NOT state D4586 compliance. Check the tube label; if it isn't printed there, a D4586-labeled cement (e.g. Henry 208 / Black Jack) is the safe swap. !! Contains petroleum distillate. DO NOT put it on the rubber collar of the IPS pipe boot (IPS forbids petroleum-based mastics there). Apply at 32 F or above, no rain for 24 hrs. ===================================================================== TOOLS (purchased) ===================================================================== [ ] Masterforce Asphalt Shingle Remover (tear-off shovel) Menards SKU 2654301 ===================================================================== STILL NEEDED / NOT ON YOUR LIST YET - CONFIRM BEFORE ROOF DAY ===================================================================== These are called for by the install docs above but are not in your purchase screenshots: [ ] Longer roofing nails for ridge cap over the ridge vent - must pass through cap shingle + vent + sheathing; typically 2" to 2-1/2". VentSure may include nails in the box - check. [ ] Sealant compatible with the pipe boot collar (EPDM/silicone-safe, NOT petroleum based) and for gutter apron/drip edge end joints [ ] Pipe boot for any 1-1/2" or 2" vent pipes (81658 only fits 3"-4") [ ] Kick-out flashing - ONLY if a step-flashed wall run ends at an eave / gutter. If the wall run ends into a valley or the wall stops above the eave, not needed. (Decide on site at tear-off.) [ ] Replacement sheathing (7/16" OSB or 1/2" plywood) for any rotted deck found at tear-off; 8d nails for it [ ] Tin snips (for cutting drip edge, valley metal, step flashing) ALREADY HAVE (confirmed 2026-09-05): chalk line, utility knife + hook blades, fall-protection harness, 3-ton / 30-yd dumpster. ===================================================================== ORDER OF INSTALL (from the docs, for reference) ===================================================================== 1. Tear off to bare deck, repair sheathing 2. Gutter apron on eaves (first metal down) 3. WeatherLock G: valleys first, then eaves 4. Tyvek Protec 120 over everything (laps over WeatherLock) 5. Drip edge on rakes (over the underlayment) 6. Valley metal on top of the underlayment 7. Starter strip, eaves and rakes 8. Shingles, step flashing woven in course by course, pipe boots and roof cap flashed in as you reach them 9. Cut ridge slot, install ridge vent 10. ProEdge hip & ridge cap